Jim Shaffer Raw Water Pipeline

Jim Shaffer Raw Water Pipeline

Fort Lupton, CO

Guided Horizontal Auger Boring

This project involved multiple bores under existing gas utilities. A 190 LF auger bore under gas lines was executed with 36”-diameter steel casing. An additional 445 LF guided auger bore was completed in the same fashion, using 36”-diameter steel casing. Finally, 635 LF of 20”-diameter C900 carrier pipe was installed as well.