Mirabelle Phase II

Mirabelle Phase II

Centennial, CO

Guided Horizontal Auger Boring

UIT installed 1,900 LF of 24″-diameter steel casing via guided auger bores crossing State Highway 85, the Union Pacific Railroad, the BNSF Railroad, and the High Line Canal. There were a total of nine trenchless crossings, the longest of which was nearly 130 LF.