Broomfield, CO

Guided Horizontal Auger Boring

This project involved multiple guided auger bores designed to help convey wastewater from the North Area Lift Station to Broomfield Wastewater Treatment Plant. The bores involved 48″- and 36″-diameter steel casing, all of which occurred under existing roadways/highways. Under Highway 7, UIT bored 185 LF of 48″-diameter; under E-470 UIT bored 345 LF and 295 LF of 30″-diameter casing; and finally an additional 222 LF of 36″-diameter steel casing under Northeast Parkway.